Product Description
OEM custom stainless steel spiral auger conveyor
Model |
SLS300-3500 |
Applicable Industries |
Food & Beverage Factory, Construction works , Ceme... |
Material |
Stainless steel, Carbon steel |
Structure |
Conveyor System |
Warranty |
1 Year |
Machinery Test Report |
Provided |
Core Components |
Motor, Bearing |
Feeding material |
Power or granule |
Length |
Customized 1~30m |
Processing |
Painting, burnishing, Bead blasting |
Speed |
Adjsutable Speed |
Material Feature |
Heat Resistant |
Dimension(L*W*H) |
Depends on the model |
Video outgoing-inspection |
Provided |
After Warranty Service |
Video technical support, Online support |
After-sales Service Provided |
Online support |
Type |
Tube, trough, shaftless, vertical |
Product Introduction:
The double-shaft screw conveyor is equipped with a solid screw in a U-shaped groove, one of which is left-handed and the other is right-handed. When working, the two screws are rotated through a pair of gears at the shaft extension position. The rotation of the spiral body makes the material move axially, so as to achieve the purpose of conveying.
Working Principle:
The material flows in from the feed port. When the rotating shaft rotates, the material is subjected to the normal thrust of the helical blade. The radial component of the thrust and the friction force of the blade on the material may drive the material to rotate around the axis, but due to the material itself Due to the gravity of the material and the friction of the trough to the material, it does not rotate with the helical blade, but moves along the axial direction of the trough under the axial component of the normal thrust of the blade.
Features:
1. Left-handed and right-handed combined conveying;
2. The cross-sectional area is large, and the conveying capacity is larger;
3. It has physical properties such as conveying, stirring, crushing, and pushing.
Technical Parameters:
Serial No. |
Model |
conveyance capacity(m³/h) |
Power(kw) |
Groove inner width(mm) |
Material |
1 |
SLS100 |
0.1-0.5 |
Specifically customized according to material, conveying volume and angle. |
198 |
carbon steel/stainless steel |
2 |
SLS150 |
0.3-1.5 |
294 |
3 |
SLS200 |
0.8-4.0 |
388 |
4 |
SLS250 |
1.5-7.5 |
486 |
5 |
SLS300 |
5.0-13.00 |
576 |
Scope of application:
It is suitable for powdery, granular and small block materials in chemical industry, environmental protection, food and other industries.
Drawing:
Product Display
Related Products
Packaging & Shipping
Certifications
Company Profile
Guangzhou Kaixi Wisdom Valley Technology Co.,Ltd was established in 2005. "Kaixi makes and serves the whole world" is the common pursuit and goal of all Kaixi people. Our company will honor our promise to customers with the business philosophy of "better technology, higher quality and better service", and make Kaixi manufacturing become the benchmark of Chinese manufacturing and go global! Welcome people from all walks of life to visit our company for on-the-spot investigation and negotiation.
We are factory and doing traditional export business more than 15 years!
If you have any demand for our products, please feel free to contact me.
FAQ
Q1: Are you trading company or manufacture?
A: We are metal factory only for oversea trading.
Q2: How long is your delivery time?
A: Generally 5~10 days for sample.and 20-40 days for mass production. it is depends on order quantity.
Q3: Do you provide samples?Is it free or extra?
A: Yes, we could offer the sample for free charge once customer place batch order.
Q4: What is your terms or payment?
A: Payment<1000USD shall be 100% T/T in advance. Payment>USD1000, 50% T/T in advance, pay balance before shippment.
Q5: Can you produce order and according to the samples?
A: Yes, we can produce by your samples .
Q6: How to get the quote ?
A: Please send your 3D drawings(PDF,STP, IGS, STL...) to us by email with the material, surface treatment and QTY, then offer the best price for you within 12 hours.
Q7: What are your shipping way?
Sample order: by air freight with 7-15 days.
Batch order: by sea ship( or by train to Europe) with 30-40 days.